PROJECT DESCRIPTION | TYPE / SCOPE OF WORK | CLIENT / CONTRACTOR | CONSULTANT |
Jumeirah Beach Residence Project (JBR 3) | Piling Works | Tecom / Mace: | Mace / Arenco |
(5B+G+34) Wind Tower 1, plot No.B3 JLT, Dubai | Shoring Works | Dr.R.M. Azizi / The Wind FZ LLC | Farayand Arch. & Engg. |
(3B+P+G+35+Mech.Room) Tower, Plot No.Q1,JLT,Dubai | Piling & Shoring Works | Saba R.E | Al-Hawraa |
(4B+G+34) Comm. Res. Tower Plot No.E1 @ JLT | Shoring & Piling Works | Best Homes | W.S Atkins |
Arshia Marina Tower, Proposed 2B+G+30 & 2B+G+1 Com.Res.Bldg. Plot No.392-455 (5N) Marsa, Dubai. | Piling & Shoring Works | Arshia Marina Co. | Al-Hawraa Consultant |
Gate Garden District-Package No.G20000 For DIFC | Piling & Shoring Works | DIFC / MACE (Client Representative) | Hopkins Consultant |
(3B+G+44+R) Res. Tower, Plot No.j2 at JLT, Dubai | Piling & Shoring Works | Mr.Moh’d Abdullah Bin Obaidullah | Art Consultant |
Proposed 5B+G+39 Storey Offices & Furnished Appartment Tower on Plot No.C2 at JLT, Dubai | Shoring Works | Ascon | M/s.Dar Consultant |
LakeShore Tower 1 (JLT) Plot No.JLT-PH2-Y2 for Al Bodor Real Estate Development | Piling Works | Capital Investment | M/s.Khatib & Alami |
(3B+G+12) Bldg. for Mr.Salem Abdulla Bin Touq on Plot No. 241-458 Al Nahda | Shoring Works | OST Construction | M/s.Ziki Homsi |
(3B+G+12) Office Bldg. on Plot – T2 JLT Dubai | Piling and Shoring Works | Han Investments | National Engineering Bureau |
(B+G+M+41 FLRS) Res./Comm. Bldg. Plot No.335-147 at Trade Center First, for H.E.Al.Sheikh Rashid Bin Khalifa Bin Saeed Al Maktoum | Piling & Shoring Works | Al Shafar Contr. | Incorporated (Conin) |
(4B+G+6P+1HC+27) Typ.Floor Comm./Office Tower on Plot No. BB.A02.017 at Buiness Bay, Duabi | Piling & Shoring Works | M/s. ETA Star Property Developers | M/s. N.E.B |
(G+55) Storey Tower & (G+8) Car Parking Building Plot No. 336-208 (Maze Tower), Trade Center Second, Dubai | Earth Works & Piling Works | Mr.Abdulla Hassan Al Rostamani | M/s. Dar Consultant |
Proposed (G+M+69) H.H.H.R Tower for H.H.Sheikh Hamadan Bin Rashid Al Maktoum on Plot No 335-112,335-203 at Trade Center First, Sheikh Zayed Road | Piling & Shoring Works | H.H. Sheikh Hamadan Bin Rashid Al Maktoum | M/s. Al Hashemi |
Hilton Hotel & Resorts – Ras Al Khaimah | Piling Works | Govt. of Ras Al-Khaima-Ruler’s Court | M/s. W.S Atkins |
MOTOR CITY – Automall complex at Nad Al Shibba | Piling & Shoring Works | M/s.Union Properties | M/s.EDARA / N.E.B |
R 659/11 – Comprehensive Improvement of Sheikh Zayed Road, Jumeira Lake Towers INterchange (I/C 5.5) | Piling Works | M/s.Dutco Balfour Beatty / M/s. Road Transport Authority | M/s. Parsons De Leuw Cather |
5B+G+2M+27 Corp.Executive Hotel & Offices on Plot No.BB.A01.036 at Business Bay – Duabi | Shoring (Contiguous & Piling Works) | M/s.Reef Real Estate & H.H Sheikh Mohammad Zayed Saqer Al Nahyan | M/s.Erga Progress |
R882/2- Improvement of Al Safooh Area Road Network Roads R3 & R5 | Piling Works | M/s. Wade Adams Cont./M/s. RTA | M/s.Parsons De Leuw Cather |
Lam Tara Towers Podium (6B+G+M+10P) + Res.Tower (6Mech+70 Flrs) + Office Tower (5Mech+60 Flrs) on Plot No.343-983 at Al Wasl, Sheikh Zayed Road, Dubai. | Piling & Shoring Works | Mr.Saeed Manana Ghedair Ejtebi | M/s.Dimensions Engg.Consultants/M/s.Al Binaa Project Manager |
Dubai World Central International Airport Project No.JXBI/BLD/420 – Air Traffic Control Tower | Piling Works | M/s.Government of Dubai, Department of Civil Aviation / M/s.Arabtec Construction L.L.C | M/s.Dar Al-Handasah Shair & Partners |
La Hoya Bay Reidence -1 at Al Marjan Island at Ras Al Khaimah – Package 0515 | Piling Works | M/s.Khoie Properties | M/s.Al Turath Engg.Consultants |
Reef Ajman Tower at Nakheel (B), Block O, Ajman | Shoring Works (Contiguous) | M/s. Reef Real Estate | M/s. Keo International |
(2B+G+12FL+R)Bldg. on Plot No.241-399 at Al Nahda 2nd Dubai – U.A.E | Shoring Works (U-Beams + Secant) | M/s.Hana & Maryam Banat Obaid Mohammad Abdulla Al Helo | M/s.Art Consultant |
(3B+G+MC+45F+R) Tower on Plot No.JLT-PH1-M2 at Jumeirah Lake Towers, Dubai. | Shoring Works (Contiguous Pile) | Mr. Mohammad Ibrahim Obaidullah | M/s. Art Consultants |
Clayton Residency on Plot no BB.B03.004 at Business Bay, Dubaii | Piling and Shoring Works (U-beams) | M/s. Deyaar Development PSC | M/s. Arab Experts Engineering Consultants (AREX) |
Fortune Avenue Tower on Plot no. BB.A06.018 at Business Bay, Dubai | Piling & Shoring (Secant Pile) | M/s. Fortune Investment Group L.L.C. | M/s. Architecture & Engineering Innovations Bureau |
The Courts Tower on Plot no. BB.A02.015 at Business Bay, Dubai | Piling & Shoring (Diaphragm wall) | M/s. Tanmiyat Group | M/s. Mansouri & Bayaty Architects (M.B.A) |
Jaddaf Project on Plot no A03, A04, E13, D10, D12 & D13 | Shoring Works (Secant) | M/s. RGM Limited / Ms.CPM | M/s.ARENCO |
Contract R881/2C Comprehensive Improvement of the Parallel Roads, Dubai | Piling Works | M/s. Roads & Transport Authority (RTA) / M/s. Salini Dubai | M/s. Parsons De Leuw Cather |
Marina Arcade on Plot no. 392-489 at Dubai Marina, Dubai | Piling & Shoring Works (Secant) | M/s. Mada’in Properties / M/s. international Project Management (IPM) | M/s. Arc International |
Palm Jumeirah Sofitel Resort at Palm Jumeirah, Crescent Parcel no. PJCR 28 & PJCR 29, Dubai | Piling Works | M/s. Mirk General Trading L.L.c. | M/s. Burt Hill |
(4B+G+3P+24Sorey) Residential and Retail Building on Plot no. P1.D011 at Culture Village, Dubai | Shoring Works (Secant Piles) | M/s. Emirates Sunlad Group | M/s. Al Wasl Al Jadeed Consultants/ Design Concepts |
Residential Tower (2B+G+3Podiums + Recreation + 18 Floors) on Plot no. BB.B03.005 at Business Bay, Dubai for M/s. Farida Farnood | Shoring (Secant Pile) and Piling | M/s. Farida Farnood/ M/s. Sherkhan Farnood General Trading Co. | Arab Experts Engg. Consultants |
Commercial Building for Mr. Ahmed Mubarak Al Mazrouri on Plot no. C-86, Sector E-11, Abu Dhabi | Shoring (Secant Pile) and Piling Works | M/s. Al Fara’a General Contracting | M/s. Al Turath Engineering |
4B+G+45FLOORS Building in Kabul, Afghanistan | Piling Works | M/s. Azizi Investment | |
Construction of Batinah Costal Road Phase – 1, Section 11 from Km 176+000 to Km 241+67, Sultanate of Oman | Piling Works | Supreme Committee for Town Planning, Sultanate of Oman./ Nagarjuna Construction Company International LLC.. | National Engineering Services |
STELLA Dubai Hotel 3B+G+30 Floors on Plot No.(392-436), Marsa Dubai, Dubai for M/s. Ayoub Adly Ayoub Ghattas | Shoring Works (Secant piling + U Beams) & Demolition Works | M/s. Ayoub Adly Ayoub Ghattas | M/S CONIN (Incorporated Consultants) |
Commercial Building for Mr.Hadi Hamad Hwaired Al Mansouri Plot No.C-9, Sector M2-12, Abu Dhabi. | Shoring & Piling Works | M/s.Al Qantara General Contracting Company | M/s.American Consultant Office. |
(2B+G+35) (2B+G+30) AL FATTAN Mix use on Plot No. 392-513 @ Marsa Dubai | Shoring & Piling Works | AL FATTAN Properties | M/S IMAGE |
(2B+G+19) Harbour Residence on Plot No. 392-484, Marsa Dubai for Marina 3K Limited | Shoring & Piling Works (Secant) | MARINA 3K LIMITED – EMAAR | BARAJEEL CONSULTANT/AL HAWRA’A ENGINEERING |
Proposed (B+G+31) Hotel Building on Plot No. 392-426 @ Marsa, Dubai | SHORING (BEAMS) & PILING WORKS | NEW DUBAI PROPERTY | AL AJMI ENGINEERING CONSULTANTS |
R1013 Hotel Building 2B+G+M+7+HC on Plot No. 124-170, Al Muraqabat, Dubai | ENabling works | WASL (Asset Management Group) | Dimensions Architecture Unlimited |
Al Jaziri Tower (3B+G+3P+60 Floor) On Plot No. BB.AA03.023 & 024 at Business Bay, Dubai | Shoring Works (Secant Wall) | M/S KELE CONTRACTING | M/S NED |
P30-Proposed B+G+M+7 Typical Mixed Development and G+4+R multi-Storey Building, DAFZA, Dubai | Shoring (Beams) & Piling Works | M/S DAFZA | M/S LACASA Architects & Engineering Consultants |
Dubai Creek Harbour Project @ Lagoon, Dubai | Piling Works | M/S EMAAR | M/S W.S ATKINS |
FOUNTAIN VIEW No.1,2 & 3 | Piling Works | EMAAR | DEWAN AL AMARA |
Dubai Mall Expansion (Zone 1,2 & 3) | Shoring & Piling Works | EMAAR | M/S WSP/TURNER |
Proposed (4B+G+14) National Bank of Abu Dhabi Building On Plot NO. 326-1451 @ Al Jaddaf, Dubai-UAE | Piling & Shoring Works (Diaphragm Wall) | M/S AL AMAR ENGINEERING & CONTRACTING CO.LLC | M/S ARENCO |
PROPOSED HOTEL 1 THE AVENUE PHASE2 @ AL WASL, DUBAI-UAE | Piling Works | M/S MERRAS HOLDING | M/S WME |
PROPOSED MIXED USE DEVELOPMENT AL FATTAN TOWERS ON PLOTNO. 215-0458 @ UMM RAMOOL, DUBAI-UAE | Shorinng (Beams) + Piling Works | M/S AL FATTAN PROPERTIES | M/S AE7 |
AFC 023 Serviced Apts. @ Al Furjan, Dubai | Shorinng (Contiguous) + Beams + Piling | Shk Ahmed Bin Mohd Bin Zayed Bin Saar | M/S Global Engineering Office |
Double Tree by Hilton Hotel @ Masdar City, Abu Dhabi | Shoring (Contiguous) + Piling Work | Reliable Property Invest. | M/S Global Engineering Office |
DDubai Inn Hotel @ AL WASL | Shoring & Piling Works | M/S. EMAAR PROPERTIES PJSC. | M/S. ARCH GROUP CONSULTANTS |
DDubai Inn Hotel @ Marina | Shoring & Piling Works | M/S. EMAAR PROPERTIES PJSC. | M/S. ARCH GROUP CONSULTANTS |
Fountain Substation at Downtown Dubai Development | – | M/S. TURNER/EEE | M/S. POYRY ENERGY |
Bateen Marina Resort Development Plot No. C103, Sector W-35 – Abu Dhabi | Secant + Diaphragm+Piling | H.H.SHK MOHD BIN KHALIFA | M/S. ACG |
W – Resort Hotel & Residence @ Palm Jumeirah | Drilling of Deepwells | M/S. ACTION INTERNATIONAL DRILING SERVICES & DEWATERING LLC | M/S. RMJM |
W – Resort Hotel & Residence @ Palm Jumeirah | Contiguous + Piling Works | M/S. AZIZI INVESTMENT LLC | M/S. GAJ / M/S. SHEPHERD GILMOUR |
Entisar Tower @ Shaikh Zayed Road, Dubai – UAE | Trial Pits | M/S. MEYDAN GROUP LLC | M/S. AE7 |
W – Resort Hotel & Residence @ Palm Jumeirah | Shoring – Beams | M/S. AL FUTTAIM CARILLION | M/S. RMJM |
Proposed Nikki Beach Resort For M/s. DSA Architects International @ Pearl Jumeirah – Dubai | Shoring (U-Beams) | M/S. BROOKFIELD MULTIPLEX | M/S. D. S. A |
(B+G+7+Roof) Residential / Hotel Apts. On Plot No. PJCRC14 @ Palm Jumeirah | Piling Works | M/S. C FOURTEEN FZE / GCC | M/S. NATIONAL ENGINEERING BUREAU |
(B+G+8+GYM) Hotel Project on Plot No. PJCRC38F @ Palm Jumeirah | Enabling Works (Shoring + Piling) | M/S. NEW DUBAI PROPERTIES | M/S. RIMAL ENG. CONSULTANTS |
(G+8TYP.+Roof) Residential Building On Plot No. 22-026 @ Dubai Silicon Oasis | Shoring Beam | M/S. ANC CONTRACTING DUBAI | – |
Al Fattan Down Town On Plot No. 3340109 @ Al Wasl – Dubai | Shoring (Secant Pile) + Piling Works | M/S. AL FATTAN | M/S. AE7 |
(G+8+GYM) On Plot No. 21-017 Axis – Gold 5 @ Silicon Oasis | Shoring Beam | M/S. ANC CONTRACTING DUBAI | M/S. DESIGN CENTER |
Site Preparation Fencing, Offices On Plot No. 275 (681-1107) Al Barsha, South Fourth (681), JVC Dubai, U.A.E. | Site Preparation (Fencing, Offices & Sign Board) | FAST LINK / MR. ALI MOHD. SALEM ABU ADAS | M/S. AL GURG CONSULTANT |
Five Story Labour Accommodation Building for M/s. BILT MIDDLE EAST LLC on Plot No.559-1773 at Jebel Ali Industurial (1), Dubai, UAE | Shoring (U-Beams) | M/S. BILT MIDDLE EAST LLC / M/S. AL BASTI & MUKTHA LLC | M/S. AL SARAYA ENGINEERING CONSULTANTS |
W – Resort Hotel & Residence @ Palm Jumeirah – On Plot No. PJCRC09 & C10 | Sheet Piling | M/S. ACTION | M/S. RMJM |
(B+G+4FLRS.+R) Bldg. On Plot No. JVC 13C MRA 007 @ Al Barsha South Fourth – Dubai | Shoring (U-Beams) | JAMAL HAMAD AL SAGHEER | M/S. DIMENSIONS |
Resort Hotel Building (B+G+13) for Mr. Abdullah Ahmad Al Moosa On Plot No. PJTRH02 @ Palm Jumeirah | Piling Works | M/S. CHINA STATE / M/S. BAUER | M/S. ARENCO |
For Proposed Ladybird Early Learning Center for M/s. Malicon Holldings Ltd. On Plot No. JVC12NUP001, Jumeirah Village Circle, Dubai – U.A.E. | Shoring (U-Beams) | M/S. AL SHAFAR CONTRACTING CO. LLC | M/S. SHEPHERD GLIMOUR |
Hotel Building (2B+G+2P+18+Roof) On Plot No. BB.A05.008 @ Business Bay | Shoring (beams + secant) + Piling | M/S. NEW DUBAI PROPERTIES | M/S. RIMAL ENG. CONSULTANTS |
Hotel (B+G+22) On Plot No. 143 (392-454) @ Dubai Marina – The One Hotel | Shoring (beams) + Piling | M/S. NEW DUBAI PROPERTIES | M/S. AL AJMI ENG. CONSULTANTS |
Proposed (B+G+2) Spring Community Center On Plot No. 394-6998 @ Emirates Hills – Dubai | Shoring (Secant + Contiguous) + Piling Works | M/S. EMAAR PROPERTIES PJSC | M/S. DAR CONSULTANTS |
Proposed (B+G+4+Roof) Residential Building for M/s. Emad Aziz Mitry Saad On Plot No. JVC14CMRP004 @ Jumeirah Village – Dubai | Shoring (U-Beams) | M/S. AL SAYEGH CONTRACTING LLC | M/S. WINNERS CONSULTANT ENGINEERING |
(B+G+4) Residential Building On Plot No. JVC13KMRP003 @ Al Barsha South Fourth, Dubai | Shoring (Beams + Contiguous) | MOH’D AL BARGUTHI & ALI MOH’D ABU ADAS / M/S. FAST LINK REAL ESTATE | M/S. AL GURG CONSULTANTS |
Proposed (2B+G+5) Ports View Mixed Use Development On Plot No. 321-2722, Dubai – U.A.E. | Shoring Works (Contiguous) | M/S. AL WASL | M/S. ARKITEKNIK INTERNATIONAL |
(B+G+7+R) Residential Building On Plot No. IC3-C-29-34 at Al Warsan Fourth 624, International City – Dubai | Shoring ( U-Beams) | M/S. AL ASHRAM CONTRACTING LLC | M/S. ERGA PROGRESS |
Fountain Views Exit Tunnel to M003 Road (FV Mini Tunnel) | Shoring Works | M/S. EMAAR PROPERTIES PJSC. / M/S. TURNER | M/S. HALCROW |
(3B+G+2P+19) SOL Avenue Tower Plot No. 346-647 at Business Bay | Reanchoring Works | M/S. BHATIA CONTRACTING | – |
Construction of Hotel Apartment On Plot No. PJCRC 35A-B @ Palm Jumeirah, Dubai | Secant Wall | M/S. FAST LINE INVEST / ALI MOH’D ABU ADAS | M/S. NORR GROUP |
Mulberry @ Park Heights Phase 1, Dubai | Piling Works | M/S. EMAAR PROPERTIES PJSC. | M/S. FAITH FULL & GOULD / M/S. LACASA |
Proposed 3B+G+M+30 Hotel Building On Plot No. C-008-013, TECOM -Dubai, U.A.E. | Secant Wall + Piling | ABDUL RAHMAN ABDULLA MOHD AL JAZIRI / BADER ABDULLA MOHD AL JAZIRI | M/S. DESIGN CENTER |
Proposed (B+G+1) Villas On Plot No. PJJPFJ37 FROND J & Plot No. PJJPF106 & 107 FROND I @ Palm Jumeirah, Dubai | Shoring U-Beams | M/S. MOHAMMED JAWDAT AYESH MUSTAFA AL BARGUTHI & M/S. FAST LINE | M/S. WHITE SPACE ARCHITECTS |
Down Town Dubai Development Fountain Views Residential Entrance Tunnel | Shoring Works | M/S. EMAAR PROPERTIES PJSC. | M/S. HALCROW |
(2B+G+14+Health Club) & (2B+G+12+Health Club) Comm. & Residnetial Bldg. On Plot No. 326-1667 @ Jaddaf, Dubai | Shoring (Contiguous Piles) | M/S. FGB / MISMAK | M/S. NATIONAL ENGINEERING BUREAU |
Proposed Commercial & Resd. Building (G+7) On Plot No.: (317-222) @ Al Mankhool, Dubai – UAE | Shoring Works (Beams + Secant) | MR. ADIL KAMIL HASIM BARQAN MUSTAFAWI | M/S. ART CONSULTANTS |
G+3P+13 Typical Residential + 2H Residential Building On Plot No. 275 (681-1107) @ Al Barsha South (681) JVC, Dubai – U.A.E | Piling Works | MR. ALI MOH’D SALEM ABU ADAS / M/S.FAST LINE REAL ESTATE DEVELOPMENT | M/S. AL GURG CONSULTANTS |
Dubai Parks Lagoon Phase 1 | Piling Works | M/S. AL NASR CONTRACTING CO. LLC | M/S. CHSS |
Proposed Hotel (3B+G+6F) On Plot No. 326-0897 @ Jaddaf for Mr. Hashim Abdulla Ahmad Al Dabal | Secant + Piling Works | MR. HASHIM ABDULLA AHMAD AL DABAL | M/S. ERGA PROGRESS |
Adventz Tower On Plot No.345-391, Burj Khalifa District, Dubai-UAE | Shoring (Secant) | M/S. SJM ELYSIUM PROPERTIES LLC / SYNERGY PROPERTY DEVELOPMENT | M/S. AL BURJ CONSULTANTS |
Mixed Use Development on Plot 8884532 (Plot – 03) Deira Waterfront Development, Dubai – UAE | Shoring (Secant) + Piling Works | M/S.DEIRA WATERFRONT DEVELOPMENT | M/S.AE7 |
Mixed Use Development on Plot 8884426 (Plot – 13) Deira Waterfront Development, Dubai – UAE | Shoring (Secant + Diaphragm)n + Piling Works | M/S.DEIRA WATERFRONT DEVELOPMENT | M/S. AE7 |
R0477 Res. Bldg. On Plot No. 359-0973 @ Al Quoz, Dubai – UAE | Preliminary Works + Excavation | M/S. AL WASL | M/S. AL GURG CONSULTANTS |
R1065 Hotel Staff Accommodation On Plot No. 359-0963 @ Al Quoz, Dubai – UAE | Shoring (U-Beams) | M/S. AL WASL | M/S. ARKIPLAN CONSULTING ARCHITECTS & ENGINEERS |
(B+G+8+GYM) Hotel Building On Plot No. PJCRC32G @ Palm Jumeirah Dubai – UAE | Shoring & Piling Work | M/S. REEM AL SHARAI GENERAL TRADING L.L.C / M/S. NEW DUBAI PROPERTIES | M/S. RIMAL ENG. CONSULTANTS |
Proposed (B+G+1P+16+R) Hotel Building On Plot No. 346-585 @ Business Bay, Dubai – UAE | Shoring (U-Beams) + Piling | AL SAHIL AL AKHDER / M/S. NEW DUBAI PROPERTIES | M/S. AL AJMI ENG. CONSULTANTS |
Meydan Beach Hotel for Enabling Works – Package II – | Shoring & Excavation Works | – | – |
Shoring Works (Secant Piles) | M/S. MEYDAN GROUP LLC | M/S. AE7 | Dubai Mall Zaabel Expansion |
Shoring (U-Beams) | M/S. BROOKFIELD MULTIPLEX | M/S. AECOM | DPDP-6009 – Infrastructure Work Phase Dubai Parks, Hotel – 1 Bridge |
PILING WORKS | M/S. GHANTOOT CONTRACTING | M/S. HALCROW | Comprehensive Improvements Of The Parallel Roads-Phase 2A |
DRILLING FOR DEEP WELL | M/S. ACTION | – | – |
Town Square – Proposed Resid. & Comm. Mix Developments On Plots No. 922-8918 (PH-01-009 & 010) Al Yalayes – Dubai, UAE | Piling Works + Shoring(U-Beams) | M/S. NSHMI DEVELOPMENT LLC | M/S. AL GURG CONSULTANTS |
Emaar Properties PJSC Proposed Pedestrian Bridge Address Connection Burj Khalifa Development Dubai – UAE | Piling Works | M/S. DUTCO / M/S. EMAAR PROPERTIES PJSC | M/S. AECOM |
Improvement of Al Wasl road Phase 1B Interchange 2.5 – R921/1B | Piling Works | M/S. CHINA STATE / RTA | M/S. PARSONS |
The Lagoons-Phase 1 Proposed DCH Sales Center Bldg. (G+2) @ Al Kheeran, Dubai – U.A.E. | Excavation & backfilling Works | M/S. EMAAR PROPERTIES PJSC | M/S. TURNER |
Address Residences – Dubai Opera @ Dubai Downtown, Plot – A2 & A3 | Shoring Works by Diaphragm Wall | M/S. EMAAR PROPERTIES PJSC | M/S. KHATIB & ALAMI |
Dubai Mall Expansion (ZABEL AREA) | Additional Load Tests | M/.S. HEGAZY / M/S. EMAAR PROPERTIES PJSC | M/S. HEGAZY |
Zabeel Feed Mill On Plot No.: 841-3156, Margham, Dubai, U.A.E. (FNC Project Ref. No. # 6345) | Piling Works | M/S. FUJAIRAH NATIONAL CONSTRICTION CO. L.L.C | M/S. AE7 |
HIRING EQUIPMENTS | Hiring Equipments | DIC | – |
Arabian Crown Tower Plot No. 045-07 A, City of Arabia, Dubai. | Piling Works | M/S. MIDDLE EAST DEVELOPMENT | M/S. OPTIMUM ENGINEERING |
G + 7 Typical Floors + Roof On Plot No. AC4-42 at Dubai World Central – Dubai, U.A.E. | Shoring U-Beams | M/S. RADAR DWC LLC / MS. AL JAWAL CONTRACTING COMPANY | M/S. NATIONAL ENGINEERING BUREAU |
Retail Mall Car Park @ Dubai Hills Estate – Dubai, U.A.E. | Piling Works | M/S. EMAAR PROPERTIES PJSC. | M/S. ARCADIS |
Proposed (2B+G+55F) Meydan Beach Hotel Enabling Package II Piling Works On Plot No.392 0549 @ Marsa, Dubai , UAE | Piling Works | M/S. MEYDAN GROUP LLC | M/S. AE7 |
Town Square Development Proposed (G+1P+11+HC FLR) Residential Bldg. On Plot No. 035, Al Qudra, Dubai | Piling Works | M/S. NSHMI DEVELOPMENT LLC / M/S. KIER | M/S. MIMAR EMIRATES ENGINEERING CONSULTANTS |
Retail Mall Car Park – Foundation for Tower Crane @ Dubai Hills Estate – Dubai, U.A.E. | Piling Works | M/S. ALEC | M/S. ARCADIS |
Proposed B+G+6+ROOF Building for Mr. Hussam Anawar Iskandar Rabadi On Plot No. 326-0938 at Culture Village, Al Jadaf, Dubai – U.A.E. | Shoring Works | M/S. AL JAWAL CONTRACTING | M/S. EMIRATES ENGINEER CONSULTANT |
4B+G+51 Mix Use Development & 4B+G+9 Parking Building On Plot No. 335-143/184, Dubai – U.A.E. | Shoring + Piling Works | H.E MOHAMED KHALIFA BIN YOUSEF ALSUWAIDI | M/S. ARKITEKNIK INTERNATIONAL |
Dubai Creek Harbor Development – Vida Hotel, Enabling Works | Piling Works | M/S. EMAAR PROPERTIES PJSC. | M/S. MRIAGE / M/S. GAJ / M/S. ASG |
Dubai Creek Harbor Development – Under Ground Car Park, Lagoon, Ras Al Khor, Dubai | Piling Works | M/S. EMAAR PROPERTIES PJSC. | M/S. BH.N.S ENGINEERING CONSULATANT / M/S. FAITHFUL+GOULD LIMITED |
Town Square Development – Proposed (B+G+P+(14,8,12,6)+R) Residential & Commercial Bldg. On Plot No. 922-8950 (PH-01, 032 & 033), Al Qudra – Dubai | – | – | – |